river building bridge work assembly project investment crossing the design of the riverbank fence bay the passage of dunajec the progress of the the installation
Date | 2018:10:27 14:45:40 |
exif:ExifOffset | 97 |
Exposure | 1/200 |
Flash | 16, 0 |
F number | 13/1 |
FocalLength | 100/1 |
ISO | 1600, 0 |
Manufacturer | Canon |
Model | Canon EOS 5D Mark II |